
"I have just unloaded the eighth metal building from your company. As you know our substation construction schedule is on fast track with Calpine Corporation. By having these buildings pre-fab with the cable tray and electrical/ air condition systems all installed saves us considerable time...
Our building arrived on site on time and in good condition. The assembly instructions were clear; our crew (which had no prior experience with this) had no problems assembling it in a timely fashion. I found the building to be well constructed and tight fitting, I especially like the foam filled...
After wreaking havoc along the Louisiana coast, Hurricane Lili moved inland into the state causing millions in damages and disrupting the lives of thousands. Step-Ko Products and Elite Buildings had provided three metal insulated meter station buildings for Bayou Engineering for the Cal Pine...