Interstate Construction Inc.
"I have just unloaded the eighth metal building from your company. As you know our substation construction schedule is on fast track with Calpine Corporation. By having these buildings pre-fab with the cable tray and electrical/ air condition systems all installed saves us considerable time. The driver that delivered this last building was on site 1 hour and the building was offloaded onto the foundation anchored in place in 45 minutes. The crane operator and 2 journeymen linemen did this work."
Walt Harlow, Superintendent.